{"id":362,"date":"2024-05-30T13:19:48","date_gmt":"2024-05-30T13:19:48","guid":{"rendered":"https:\/\/www.furman.edu\/campus-recreation\/?post_type=furman-update&#038;p=362"},"modified":"2024-05-30T13:19:48","modified_gmt":"2024-05-30T13:19:48","slug":"pac-update-5-30-floor-work-phase-1b","status":"publish","type":"furman-update","link":"https:\/\/www.furman.edu\/campus-recreation\/updates\/pac-update-5-30-floor-work-phase-1b\/","title":{"rendered":"PAC Update 5.30 &#8211; Floor Work &amp; Phase 1B"},"content":{"rendered":"<h2>Floor Work &#8211; June 14 &#8211; 16<\/h2>\n<p>The flooring subcontractor will conduct subfloor moisture mitigation work scheduled from June 14-16, which will occur from Friday through Sunday. This essential maintenance will take place starting just left of the main entrance and will extend around to the IACH suite. The process will involve the removal of the current flooring, a thin layer of concrete, and the application of new sealing. During these dates, access to HSC, IACH, Room 105, and the IACH restrooms will be restricted. The ROTC area will remain open, albeit solely through the external entrance. We advise those affected to work from home or find an alternative workspace during this period due to the expected extreme noise levels. Once completed, the area will be safe for foot traffic, although it will be left with bare concrete until the next phase of construction begins. <strong>Please note, the Fitness Center and Pools will continue to operate as normal.<\/strong><\/p>\n<h2>Phase 1B &#8211; June 17 &#8211; July 5<\/h2>\n<p><img decoding=\"async\" class=\"wp-image-363 alignright lazyload\" data-src=\"https:\/\/www.furman.edu\/campus-recreation\/wp-content\/uploads\/sites\/137\/2024\/05\/PAC-Reno-Phase-1B-Traffic-Patterns-768x736.jpg\" alt=\"Layout of building is shown with arrows and signs.\" width=\"623\" height=\"597\" data-srcset=\"https:\/\/www.furman.edu\/campus-recreation\/wp-content\/uploads\/sites\/137\/2024\/05\/PAC-Reno-Phase-1B-Traffic-Patterns-768x736.jpg 768w, https:\/\/www.furman.edu\/campus-recreation\/wp-content\/uploads\/sites\/137\/2024\/05\/PAC-Reno-Phase-1B-Traffic-Patterns-1024x981.jpg 1024w, https:\/\/www.furman.edu\/campus-recreation\/wp-content\/uploads\/sites\/137\/2024\/05\/PAC-Reno-Phase-1B-Traffic-Patterns-1536x1471.jpg 1536w, https:\/\/www.furman.edu\/campus-recreation\/wp-content\/uploads\/sites\/137\/2024\/05\/PAC-Reno-Phase-1B-Traffic-Patterns-512x490.jpg 512w, https:\/\/www.furman.edu\/campus-recreation\/wp-content\/uploads\/sites\/137\/2024\/05\/PAC-Reno-Phase-1B-Traffic-Patterns-1280x1226.jpg 1280w\" data-sizes=\"(max-width: 623px) 100vw, 623px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 623px; --smush-placeholder-aspect-ratio: 623\/597;\" \/><\/p>\n<p>Phase 1B is slated to begin on Monday, June 17. CRW will post signs around the exterior of the building showing patrons where to enter. All traffic will be rerouted to the South-side entrances during this phase. A temporary swipe-in station will be setup just outside of the women&#8217;s locker room. See the image right for the full traffic pattern adjustments.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Floor Work &#8211; June 14 &#8211; 16 The flooring subcontractor will conduct subfloor moisture mitigation work scheduled from June 14-16, which will occur from Friday through Sunday. This essential maintenance will take place starting just left of the main entrance and will extend around to the IACH suite. The process will involve the removal of [&hellip;]<\/p>\n","protected":false},"featured_media":364,"template":"","update-categories":[],"class_list":["post-362","furman-update","type-furman-update","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/updates\/362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/updates"}],"about":[{"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/types\/furman-update"}],"version-history":[{"count":4,"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/updates\/362\/revisions"}],"predecessor-version":[{"id":368,"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/updates\/362\/revisions\/368"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/media\/364"}],"wp:attachment":[{"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/media?parent=362"}],"wp:term":[{"taxonomy":"furman-update-category","embeddable":true,"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/update-categories?post=362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}