{"id":356,"date":"2024-05-21T18:35:21","date_gmt":"2024-05-21T18:35:21","guid":{"rendered":"https:\/\/www.furman.edu\/campus-recreation\/?post_type=furman-update&#038;p=356"},"modified":"2024-05-21T19:42:21","modified_gmt":"2024-05-21T19:42:21","slug":"pac-update-5-21-exterior-signage-added-moisture-test-more","status":"publish","type":"furman-update","link":"https:\/\/www.furman.edu\/campus-recreation\/updates\/pac-update-5-21-exterior-signage-added-moisture-test-more\/","title":{"rendered":"PAC Update 5.21 &#8211; Exterior Signage Added, Moisture Test, &amp; More"},"content":{"rendered":"<h2>Exterior Signage<\/h2>\n<p>The first step of increasing wayfinding in and around the building was completed with the installation of our new exterior sign. This should help visitors readily identify departments housed within the PAC from the road now.<\/p>\n<h2>Moisture Test<\/h2>\n<p>Moisture testing is being completed on the subfloor of the perimeter of the building to test for optimal flooring selection. Subcontractors are expected to remove a small portion of the floor by the corner of Health Sciences and ROTC. The subfloor will remain visible until that phase of the renovation is complete. Caution tape\/signage will be placed to warn visitors of the flooring change, but the area is expected to remain open.<\/p>\n<h2>Minor Gym Floor Repair<\/h2>\n<p>The flooring vendor will be coming back 5\/28-31 to repair a small section of the gym floor in front of an office door. The gym is expected to remain open and operational during this time. Facilities will install a small curtain to help curtail dust.<\/p>\n<h2>2nd Floor Fitness Center Doors<\/h2>\n<p>Doors on the second floor into the fitness center will be removed and prepped for glass. A temporary plastic barrier will be installed in the interim. Doors with the glass are expected to be reinstalled within 1-2 days.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Exterior Signage The first step of increasing wayfinding in and around the building was completed with the installation of our new exterior sign. This should help visitors readily identify departments housed within the PAC from the road now. Moisture Test Moisture testing is being completed on the subfloor of the perimeter of the building to [&hellip;]<\/p>\n","protected":false},"featured_media":357,"template":"","update-categories":[],"class_list":["post-356","furman-update","type-furman-update","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/updates\/356","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/updates"}],"about":[{"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/types\/furman-update"}],"version-history":[{"count":4,"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/updates\/356\/revisions"}],"predecessor-version":[{"id":361,"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/updates\/356\/revisions\/361"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/media\/357"}],"wp:attachment":[{"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/media?parent=356"}],"wp:term":[{"taxonomy":"furman-update-category","embeddable":true,"href":"https:\/\/www.furman.edu\/campus-recreation\/wp-json\/wp\/v2\/update-categories?post=356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}